The first public announcement material for the environmental impact assessment of a new rubber

1. Situation of the construction unit

(1) Construction project name: a new rubber production line with an annual output of 50,000 tons of recycled rubber, rubber powder and asphalt modifier for reason;

(2) Early contact unit: Jiangsu Ruisec Environmental Protection Equipment Technology Co., Ltd.

(3) Contact: Mr. Jiang

(4) Contact number: 13905117599

2. Situation of Environmental Assessment Units

Unit name: Nanjing Saite Environmental Engineering Co., Ltd.

Unit location: No. 285, Zhongshan North Road, Nanjing

Contact: Yu Gong

Contact number: 025-85280277

Email: 1582123417@qq.com

3. Basic situation of the project

Construction project name: a new rubber production line with an annual output of 50,000 tons of recycled rubber, rubber powder and asphalt modifier for reason;

Construction nature: other;

Main construction content: Jiangsu Ruisec Environmental Protection Equipment Technology Co., Ltd. plans to build a new annual output of 50,000 tons of recycled rubber, rubber powder and rational asphalt modifier at No. 288, Goudun Town Industrial Concentration Zone, Funing County, Yancheng City, Jiangsu Province Rubber production line, the total investment of the project is 30 million yuan to purchase waste tire crushing and recycling production line, plasticizing extrusion production line and other equipment. After the completion of the project, it will have an annual production capacity of 50,000 tons of recycled rubber, rubber powder and asphalt modifier rubber.

4. Working procedures and main work content of environmental impact assessment

The environmental assessment unit mainly judges whether there are environmental problems that restrict the construction and operation of the project based on the current environmental quality of the project location; analyzes its economic and technical feasibility based on the main environmental protection measures to be taken; from planning, industrial policy, clean Production level, pollutant discharge status, total amount control, environmental impact forecast analysis, environmental risk, combined with public participation investigation, analyze the environmental feasibility of the project. And give corresponding suggestions from the perspective of environmental protection, in order to better protect the environment.

V. Main issues for soliciting public opinions

(1) Are you satisfied with the status quo of environmental quality (if not satisfied, please indicate the main reason)

(2) Do you know/understand the projects built in this area

(3) What information channel did you use to learn about the project?

(4) According to your knowledge, the hazards/impacts caused by the project on environmental quality are:

(5) From the perspective of environmental protection, what is your attitude towards the project, please briefly explain the reasons.

(6) Do you have any suggestions and requirements for the environmental protection of this project?

(7) Do you have any suggestions and requirements for the environmental protection department to approve the project?

6. Public feedback form

After this information publicity, the public can send emails, telephones, letters, face-to-face interviews, etc. to the designated address to express their opinions on the construction of the project and the environmental impact assessment.